{
  "node_id": "eu-ten-e-cross-border-energy-regulation-2022-869",
  "title": "EU TEN-E Regulation 2022/869 - Trans-European Energy Infrastructure Projects",
  "domain": "Energy & Utilities",
  "version": "1.0.0",
  "last_updated": "2026-05-02",
  "bluf": "Regulation (EU) 2022/869 on guidelines for trans-European energy infrastructure (TEN-E recast) replaces Regulation (EU) 347/2013 and removes natural gas infrastructure from the Projects of Common Interest (PCI) list, instead prioritising electricity, hydrogen, smart electricity grids, and CO2 infrastructure. PCIs benefit from a one-stop-shop permitting process with a maximum 3.5-year permitting period. Offshore renewable energy grid developments and smart gas grids involving hydrogen are eligible categories. The Regulation implements the EU's Green Deal infrastructure obligations.",
  "paywall": {
    "status": "LOCKED",
    "unlock_cost_usd": "0.01",
    "skyfire_id": "41779894-ece2-4163-9761-b3b1b76e19b0"
  },
  "crosswalks": {
    "_available_keys": [
      "ten_e_347_2013_repealed",
      "eu_electricity_market_reform_2024",
      "eu_hydrogen_strategy",
      "eu_taxonomy_energy",
      "ai_overlay_2026"
    ],
    "_note": "Full crosswalk values included in vault response"
  },
  "dependencies": [
    "eu-electricity-regulation-2019-943",
    "eu-electricity-directive-2019-944",
    "eu-hydrogen-strategy-2020-investment-framework"
  ],
  "primary_citations_count": 8
}