Bidda Sovereign Intelligence · 10,084 Verified Nodes · 39 Sovereign Pillars

Plant Breeders’ Rights Act, Section 27: Decision of Commissioner

Plant Breeders’ Rights Act, Section 27(1): "If the Commissioner approves a denomination proposed by an applicant under section 14 and, after consideration…

What Plant Breeders’ Rights Act, Section 27: Decision of Commissioner requires

Plant Breeders’ Rights Act, Section 27(1): "If the Commissioner approves a denomination proposed by an applicant under section 14 and, after consideration of the application in accordance with subsection 23(1) and evaluation of the…

This is a preview. The full record adds the complete summary, 12 workflow steps, 12 schema fields and 12 primary citations. Start a free trial or see pricing.

Pillar: Agriculture & Agritech · Authority: Parliament of Canada · Version: 2.0.0 · Last updated:

Primary source: https://laws-lois.justice.gc.ca/eng/acts/P-14.6/FullText.html

SHA-256 integrity: 63c9e7322a9f92b15c64096ba322010c94c8810f6b8a5b627f31ae566e21620c

Primary Citations — 12 traced to source

  • Plant Breeders’ Rights Act, Section 27(1) (consolidated text current to 2026-10-19): "If the Commissioner approves a denomination proposed by an applicant under section 14 and, after consideration of the application in accordance with subsection 23(1) and evaluation of the results of any tests and trials carried out with the plant variety to which the application relates, the Commissioner is satisfied that the plant variety meets the requirements set out in section 4 and that the application otherwise conforms to this Act, the Commissioner shall grant plant breeder’s rights in accordance with subsection (3)."
  • Plant Breeders’ Rights Act, Section 27(2) (consolidated text current to 2026-10-19): "If the Commissioner is not satisfied as described in subsection (1), the Commissioner shall refuse the application."

+ 10 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.

Access

⚠ Important: Human Verification Required

Bidda compliance nodes are reference intelligence, not legal advice. Every node must be reviewed by a qualified compliance professional or legal counsel before implementation in any enterprise workflow, regulated system, or compliance programme. See bidda.com/disclaimer for full terms.