Bidda Sovereign Intelligence · 10,099 Verified Nodes · 39 Sovereign Pillars

85/208/EEC: Commission Decision of 25 March 1985 amending Decision 80/686/EEC setting up an Advisory Committee on the Control and Reduction of Pollution Caused by Hydrocarbons Discharged at Sea

The Commission Decision 85/208/EEC amends Decision 80/686/EEC to extend the terms of reference of the Advisory Committee on the Control and Reduction of…

What 85/208/EEC: Commission Decision of 25 March 1985 amending Decision 80/686/EEC setting up an Advisory Committee on the Control and Reduction of Pollution Caused by Hydrocarbons Discharged at Sea requires

The Commission Decision 85/208/EEC amends Decision 80/686/EEC to extend the terms of reference of the Advisory Committee on the Control and Reduction of Pollution Caused by Hydrocarbons Discharged at Sea to include other harmful substances. This decision applies from 25 March 1985 and is based on the Treaty establishing the European Economic Community, as well as previous Council Decisions and the expressed wishes of Parliament and the Economic and Social Committee.

Pillar: Legal & IP Sovereignty · Authority: THE COMMISSION OF THE EUROPEAN COMMUNITIES · Version: 1.0.0 · Last updated:

Primary source: https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:31985D0208

SHA-256 integrity: 1e9311f707c56935816f17c9bb0cda8a6522afb645369827248880b977e16d48

Primary Citations — 6 traced to source

  • Article 1: 'In the title, in Articles 1 and 2 (1) and (2) of Decision 80/686/EEC, hydrocarbons discharged at sea is replaced by oil and other harmful substances discharged at sea.'
  • Article 2: 'This Decision shall apply from 25 March 1985.'

+ 4 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.

Access

⚠ Important: Human Verification Required

Bidda compliance nodes are reference intelligence, not legal advice. Every node must be reviewed by a qualified compliance professional or legal counsel before implementation in any enterprise workflow, regulated system, or compliance programme. See bidda.com/disclaimer for full terms.