Bidda Sovereign Intelligence · 10,099 Verified Nodes · 39 Sovereign Pillars

Commission Implementing Decision (EU) 2025/1483 of 31 July 2025 amending Implementing Decision (EU) 2025/1160 concerning certain emergency measures relating to sheep pox and goat pox in Bulgaria (notified under document C(2025) 5466)

The European Commission has amended Implementing Decision (EU) 2025/1160 to address the spread of sheep pox and goat pox in Bulgaria. This decision…

What Commission Implementing Decision (EU) 2025/1483 of 31 July 2025 amending Implementing Decision (EU) 2025/1160 concerning certain emergency measures relating to sheep pox and goat pox in Bulgaria (notified under document C(2025) 5466) requires

The European Commission has amended Implementing Decision (EU) 2025/1160 to address the spread of sheep pox and goat pox in Bulgaria. This decision mandates the establishment of restricted zones, including protection, surveillance, and further restricted zones, to prevent the disease from spreading within Bulgaria and to other Member States or third countries. Bulgaria is required to prohibit the movement of sheep and goats from these zones to areas outside their external perimeters until specified dates. The measures are based on the epidemiological situation and international standards, aiming to control the disease and prevent unjustified trade barriers.

Pillar: Legal & IP Sovereignty · Authority: THE EUROPEAN COMMISSION · Version: 1.0.0 · Last updated:

Primary source: https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32025D1483

SHA-256 integrity: 94f85014abb6182ce6b5360ec0c863c1801a0e90a5164c6d717efe664b57e318

Primary Citations — 6 traced to source

  • Article 1(a): 'a restricted zone, which comprises protection zones, surveillance zones, and further restricted zones, is established, in accordance with Article 21 of Delegated Regulation (EU) 2020/687, immediately by the competent authorities of Bulgaria.'
  • Article 1(b): 'the protection, surveillance, and further restricted zones, referred to in point (a), comprise at least the areas listed in Parts A and B of Annex I.'

+ 4 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.

Access

⚠ Important: Human Verification Required

Bidda compliance nodes are reference intelligence, not legal advice. Every node must be reviewed by a qualified compliance professional or legal counsel before implementation in any enterprise workflow, regulated system, or compliance programme. See bidda.com/disclaimer for full terms.