Bidda Sovereign Intelligence · 10,085 Verified Nodes · 39 Sovereign Pillars

JORC Code 2012 - Australasian Joint Ore Reserves Committee Mineral Reporting Standard

The JORC Code (2012 Edition) is the mandatory Australasian standard for public reporting of Exploration Results, Mineral Resources, and Ore Reserves; it…

What JORC Code 2012 - Australasian Joint Ore Reserves Committee Mineral Reporting Standard requires

The JORC Code (2012 Edition) is the mandatory Australasian standard for public reporting of Exploration Results, Mineral Resources, and Ore Reserves; it mandates a three-category resource classification (Inferred, Indicated, Measured) and two-category reserve classification (Probable, Proved) reported only by a qualified Competent Person with five or more years of relevant experience.

Pillar: Mining & Natural Resources · Authority: Joint Ore Reserves Committee (JORC) - Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) · Version: 2012 Edition · Last updated:

Primary source: https://www.jorc.org/

SHA-256 integrity: 685e63481edfd7d7db43f5c043500119acc985a059e7063088164372df7e8683

Primary Citations — 5 traced to source

  • {"title":"The JORC Code (2012 Edition) - Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves","url":"https://www.jorc.org/","section":"Clauses 1-30 (full Code) and Table 1 (Reporting Criteria) - Code available at jorc.org"}
  • {"title":"JORC Committee Official Website - Code, Guidelines, and Worked Examples","url":"https://www.jorc.org/","section":"JORC Code documentation, FAQ, and worked examples for Table 1 reporting"}

+ 3 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.

Access

⚠ Important: Human Verification Required

Bidda compliance nodes are reference intelligence, not legal advice. Every node must be reviewed by a qualified compliance professional or legal counsel before implementation in any enterprise workflow, regulated system, or compliance programme. See bidda.com/disclaimer for full terms.