What US 18 CFR Part 35: Filing of Rate Schedules and Tariffs (FERC) requires
US 18 CFR Part 35 implements Sections 205 and 206 of the Federal Power Act (FPA) governing rate schedules and tariffs filed with FERC by public utilities engaged in interstate transmission or wholesale of electric energy. Part 35 covers Sec 205 filings (60-day prior notice; rates effective unless suspended); cost of service rate filings; market-based rate authority; Independent System Operator (ISO) and Regional Transmission Organization (RTO) Open Access Transmission Tariffs (OATT); Order 1000 transmission planning and cost allocation; ancillary services; and complaints under FPA Section 206. Recent reforms include Order 2222 (DER participation in wholesale markets), Order 2023 (interconnection process reform), and Order 1920 (transmission planning and cost allocation).
Pillar: Energy & Utilities · Authority: US FERC · Version: 1.0.0 · Last updated:
Primary source: https://www.ecfr.gov/current/title-18/chapter-I/subchapter-B/part-35
SHA-256 integrity: 24fa3d4d28060304d8911f95e94b017d28f6c2ca2f264923e284e4cc761ebe4f
Primary Citations — 5 traced to source
- US 18 CFR Filing of Rate Schedules and Tariffs
- US 18 CFR § 35.13 Material change in rates
+ 3 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/us-18-cfr-part-35-ferc-filing-rate-schedules-tariffs.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/us-18-cfr-part-35-ferc-filing-rate-schedules-tariffs.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/us-18-cfr-part-35-ferc-filing-rate-schedules-tariffs
- Back to registry: Browse all 10,085 compliance nodes