30 CFR Part 75 (Mandatory Safety Standards-Underground Coal Mines), § 75.220: Roof control plan

30 CFR 75.220(a): "(a) (1) Each mine operator shall develop and follow a roof control plan, approved by the…

What 30 CFR Part 75 (Mandatory Safety Standards-Underground Coal Mines), § 75.220: Roof control plan requires

30 CFR 75.220(a): "(a) (1) Each mine operator shall develop and follow a roof control plan, approved by the…

This is a preview. The full record adds the complete summary, 12 workflow steps, 12 schema fields and 12 primary citations. Start a free trial or see pricing.

Pillar: Mining & Natural Resources · Authority: Mine Safety and Health Administration, Department of Labor · Version: 2.0.0 · Last updated:

Primary source: https://www.ecfr.gov/current/title-30/part-75

SHA-256 integrity: adfda43b89977b6faa59474782f567e60368e2c08b1ff5f8b6919e1f0e41c294

Primary Citations — 12 traced to source

  • 30 CFR Part 75 (eCFR, current as of 2026-11-06), § 75.220(a): "(a) (1) Each mine operator shall develop and follow a roof control plan, approved by the District Manager, that is suitable to the prevailing geological conditions, and the mining system to be used at the mine."
  • 30 CFR Part 75 (eCFR, current as of 2026-11-06), § 75.220(b): "(b) (1) The mine operator will be notified in writing of the approval or denial of approval of a proposed roof control plan or proposed revision."

+ 10 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.

Access

⚠ Important: Human Verification Required

Bidda compliance nodes are reference intelligence, not legal advice. Every node must be reviewed by a qualified compliance professional or legal counsel before implementation in any enterprise workflow, regulated system, or compliance programme. See bidda.com/disclaimer for full terms.