What 30 CFR Part 75 (Mandatory Safety Standards-Underground Coal Mines), § 75.220: Roof control plan requires
30 CFR 75.220(a): "(a) (1) Each mine operator shall develop and follow a roof control plan, approved by the…
This is a preview. The full record adds the complete summary, 12 workflow steps, 12 schema fields and 12 primary citations. Start a free trial or see pricing.
Pillar: Mining & Natural Resources · Authority: Mine Safety and Health Administration, Department of Labor · Version: 2.0.0 · Last updated:
Primary source: https://www.ecfr.gov/current/title-30/part-75
SHA-256 integrity: adfda43b89977b6faa59474782f567e60368e2c08b1ff5f8b6919e1f0e41c294
Primary Citations — 12 traced to source
- 30 CFR Part 75 (eCFR, current as of 2026-11-06), § 75.220(a): "(a) (1) Each mine operator shall develop and follow a roof control plan, approved by the District Manager, that is suitable to the prevailing geological conditions, and the mining system to be used at the mine."
- 30 CFR Part 75 (eCFR, current as of 2026-11-06), § 75.220(b): "(b) (1) The mine operator will be notified in writing of the approval or denial of approval of a proposed roof control plan or proposed revision."
+ 10 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/us-30-cfr-75-mandatory-safety-underground-coal-mines.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/us-30-cfr-75-mandatory-safety-underground-coal-mines.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/us-30-cfr-75-mandatory-safety-underground-coal-mines
- Back to registry: Browse all 10,084 compliance nodes