What US Clean Water Act - Construction Site Stormwater: NPDES Construction General Permit, SWPPP Requirements, Best Management Practices, Discharge Authorisation and Notice of Termination requires
This regulation requires operators of construction activities that disturb one acre or more, or part of a larger common plan of development, to obtain an NPDES permit before discharging stormwater. Compliance includes developing a Stormwater Pollution Prevention Plan (SWPPP) and implementing best management practices (BMPs) to control pollutants in runoff. Key authority is derived from the NPDES stormwater program as administered by EPA.
Pillar: Construction & Real Estate · Authority: United States Environmental Protection Agency · Version: 1.0.1 · Last updated:
Primary source: https://www.epa.gov/npdes/npdes-stormwater-program
SHA-256 integrity: 212ab41ce807e6dce7897f2bf0df4d6f5dc52a227a2b966a0cb5e3e75430e551
Primary Citations — 5 traced to source
- NPDES Stormwater Program - Stormwater Discharges from Construction Activities
- NPDES Stormwater Program - Operators of these sources might be required to obtain an NPDES permit before they can discharge stormwater
+ 3 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/us-clean-water-act-construction-stormwater.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/us-clean-water-act-construction-stormwater.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/us-clean-water-act-construction-stormwater
- Back to registry: Browse all 10,090 compliance nodes