What Clean Water Act Section 404 - Discharge of Fill Material into Waters: Corps of Engineers Permit Programme, Wetland Delineation and Mitigation Banking requires
The US Clean Water Act Section 404 requires that any discharge of fill material into waters of the United States, including wetlands, must obtain a permit from the US Army Corps of Engineers, as stated in 33 U.S.C. § 1344. This applies to construction projects that involve the discharge of dredged or fill materials into waters of the United States.
Pillar: Construction & Real Estate · Authority: United States Environmental Protection Agency · Version: 1.0.1 · Last updated:
Primary source: https://www.epa.gov/cwa-404
SHA-256 integrity: 6e77b5047ad6cc89480f753dc8ca6f8a04f2bcc4d813fef1ae692c008aa28781
Primary Citations — 8 traced to source
- 33 U.S.C. § 1344 - Permits for dredged or fill material
- 33 CFR § 328.3 - Wetland delineation
+ 6 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/us-clean-water-act-section-404-construction.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/us-clean-water-act-section-404-construction.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/us-clean-water-act-section-404-construction
- Back to registry: Browse all 10,090 compliance nodes