What Regulation (EU) 2019/943 on the internal market for electricity - Article 18 and Article 43 requires
This article establishes the procedures for transmission system operators (TSOs) to interact with regional coordination centres (RCCs), including reporting non-implementation of actions, justifying deviations from recommendations, and the governance structure of RCCs.
Pillar: Industrial IoT & Energy · Authority: European Parliament and Council of the European Union · Version: 1.0.0 · Last updated:
Primary source: https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32019R0943
SHA-256 integrity: 7b91292953b00202ef3171b8328f7b036977bb6f095977aea22dc72c608ef0a5
Primary Citations — 7 traced to source
- Article 18, first un-numbered paragraph: Where a transmission system operator decides not to implement a coordinated action for the reasons set out in this paragraph, it shall transparently report the detailed reasons to the regional coordination centre and the transmission system operators of the system operation region without undue delay.
- Article 18, paragraph 3: Where a transmission system operator decides to deviate from a recommendation as referred to in paragraph 1, it shall submit a justification for its decision to regional coordination centres and to the other transmission system operators of the system operation region without undue delay.
+ 5 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/eu-electricity-regulation-article-18-electricity-balancing.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/eu-electricity-regulation-article-18-electricity-balancing.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/eu-electricity-regulation-article-18-electricity-balancing
- Back to registry: Browse all 10,099 compliance nodes