What DIRECTIVE (EU) 2018/2002 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 December 2018 amending Directive 2012/27/EU on energy efficiency requires
Organizations involved in energy system planning, financing, or infrastructure investment must prioritize and consider energy efficiency improvements, especially when they are more cost-effective than supply-side solutions.
Pillar: Industrial IoT & Energy · Authority: European Parliament and Council of the European Union · Version: 1.0.0 · Last updated:
Primary source: https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32018L2002
SHA-256 integrity: 30cb8987da8028a2afe9722db0a230f86e7694c8d96b4231f1951e8fdc68c01f
Primary Citations — 6 traced to source
- Recital (2): Energy efficiency needs to be considered whenever decisions relating to planning the energy system or to financing are taken.
- Recital (2): Energy efficiency improvements need to be made whenever they are more cost-effective than equivalent supply-side solutions.
+ 4 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/eu-energy-efficiency-directive-article-6-renovation-of-public-buildings.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/eu-energy-efficiency-directive-article-6-renovation-of-public-buildings.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/eu-energy-efficiency-directive-article-6-renovation-of-public-buildings
- Back to registry: Browse all 10,085 compliance nodes