What EU TEN-E Regulation 2022/869 - Trans-European Energy Infrastructure Projects requires
Regulation (EU) 2022/869 on guidelines for trans-European energy infrastructure (TEN-E recast) replaces Regulation (EU) 347/2013 and removes natural gas infrastructure from the Projects of Common Interest (PCI) list, instead prioritising electricity, hydrogen, smart electricity grids, and CO2 infrastructure. PCIs benefit from a one-stop-shop permitting process with a maximum 3.5-year permitting period. Offshore renewable energy grid developments and smart gas grids involving hydrogen are eligible categories. The Regulation implements the EU's Green Deal infrastructure obligations.
Pillar: Energy & Utilities · Authority: European Commission (DG Energy); Agency for the Cooperation of Energy Regulators (ACER) · Version: 1.0.0 · Last updated:
Primary source: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32022R0869
SHA-256 integrity: 5091a0c05583202b2772401e512c375bfa5554fa785afbb51af3c140a6e6916f
Primary Citations — 8 traced to source
- Regulation (EU) 2022/869 of the European Parliament and of the Council of 30 May 2022 on guidelines for trans-European energy infrastructure (TEN-E recast), OJ L 152, 3.6.2022, pp. 45-110
- Regulation 2022/869 Article 3 - Projects of Common Interest: Regional Group process; eligibility criteria; Union list of PCIs
+ 6 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/eu-ten-e-cross-border-energy-regulation-2022-869.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/eu-ten-e-cross-border-energy-regulation-2022-869.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/eu-ten-e-cross-border-energy-regulation-2022-869
- Back to registry: Browse all 10,085 compliance nodes