What Conditions of Contract for Design, Build and Operate Projects (DBO Contract), 1st Edition 2008 requires
The FIDIC Gold Book establishes a contractual framework for long-term Design-Build-Operate (DBO) projects, requiring the Contractor to meet specified Operation Service Requirements and Performance Guarantees throughout a defined operational period. It grants the Employer significant 'step-in' rights under Clause 15.6 to take over operations in the event of serious Contractor default.
Pillar: Workplace · Authority: International Federation of Consulting Engineers (FIDIC) · Version: 1.0.0 · Last updated:
Primary source: https://fidic.org/books/dbo-contract-1st-ed-2008-gold-book
SHA-256 integrity: 9401944ed6b94e155b86812a9e1f7861b007e784e0eebd11e50f3a0e00bb0d7c
Primary Citations — 7 traced to source
- FIDIC Conditions of Contract for DBO Projects, 1st Ed (2008), Clause 5.2: Contractor's Documents
- FIDIC Conditions of Contract for DBO Projects, 1st Ed (2008), Clause 9: Commissioning
+ 5 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/fidic-gold-book-dbo-2008.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/fidic-gold-book-dbo-2008.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/fidic-gold-book-dbo-2008
- Back to registry: Browse all 10,085 compliance nodes