Bidda Sovereign Intelligence · 10,084 Verified Nodes · 39 Sovereign Pillars

49 CFR Part 173 (Shippers-General Requirements for Shipments and Packagings), § 173.185: Lithium cells and batteries

49 CFR 173.185: "As used in this section, consignment means one or more packages of hazardous materials accepted by an operator…

What 49 CFR Part 173 (Shippers-General Requirements for Shipments and Packagings), § 173.185: Lithium cells and batteries requires

49 CFR 173.185: "As used in this section, consignment means one or more packages of hazardous materials accepted by an operator…

This is a preview. The full record adds the complete summary, 12 workflow steps, 12 schema fields and 12 primary citations. Start a free trial or see pricing.

Pillar: Logistics & Supply Chain · Authority: Pipeline and Hazardous Materials Safety Administration, Department of Transportation · Version: 2.0.0 · Last updated:

Primary source: https://www.ecfr.gov/current/title-49/part-173

SHA-256 integrity: 676780bbe060a9a8cf8ce9fbda1728efdfb56db7e6880688811c7c1096da8079

Primary Citations — 12 traced to source

  • 49 CFR Part 173 (eCFR, current as of 2026-11-06), § 173.185 introductory text: "As used in this section, consignment means one or more packages of hazardous materials accepted by an operator from one shipper at one time and at one address, receipted for in one lot and moving to one consignee at one destination address."
  • 49 CFR Part 173 (eCFR, current as of 2026-11-06), § 173.185(a): "(a) Classification. (1) Each lithium cell or battery must be of the type proven to meet the criteria in part III, sub-section 38.3 of the UN Manual of Tests and Criteria (IBR;"

+ 10 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.

Access

⚠ Important: Human Verification Required

Bidda compliance nodes are reference intelligence, not legal advice. Every node must be reviewed by a qualified compliance professional or legal counsel before implementation in any enterprise workflow, regulated system, or compliance programme. See bidda.com/disclaimer for full terms.