What US FCC Part 25 - Satellite Earth Station Licensing, Spectrum Coordination, and NGSO Constellation Authorization requires
FCC Part 25 rules govern licensing of satellite earth stations and space stations (including NGSO constellations), requiring frequency coordination, power limits, interference protection, technical showings, and compliance with FCC space debris mitigation rules including 5-year post-mission disposal plans for LEO satellites.
Pillar: Space & Satellite Law · Authority: Federal Communications Commission · Version: 1.0.0 · Last updated:
Primary source: https://www.ecfr.gov/current/title-47/chapter-I/subchapter-B/part-25
SHA-256 integrity: ff1526d80887f861d924c978c9443365326e4328caab7f8b06dcd596c0b3008f
Primary Citations — 5 traced to source
- Subpart B earth station licences; Subpart C space station licences; 25.114 space debris — 47 CFR Part 25 - Satellite Communications
- 5-year LEO deorbit rule effective August 2022 — FCC Order on Space Debris Mitigation Rules (FCC 22-74)
+ 3 more citations (full bibliography, deterministic workflow, actionable schema and crosswalks) included in the vault unlock — $0.01 via Skyfire / L402 / Direct Base USDC.
Access
- Discovery (free): /api/v1/nodes/us-fcc-part-25-satellite-earth-station-licensing-spectrum-coordination.json — 6-field metadata
- Vault (full node): /api/v1/vault/nodes/us-fcc-part-25-satellite-earth-station-licensing-spectrum-coordination.json — full 13-key payload, $0.01 USDC (L402/Skyfire/Direct Base)
- Canonical URL: https://bidda.com/intelligence/us-fcc-part-25-satellite-earth-station-licensing-spectrum-coordination
- Back to registry: Browse all 10,099 compliance nodes